Failure Analysis of a Brass Pipes due to Stress Corrosion
Five lengths of brass pipe were submitted for testing and analyses. A cause of failure analysis was conducted on one of the lengths, “NYCHA No. 1”, which had a longitudinal crack. It was reported that “NYCHA No. 1” had leaked after only a few…