Contact Us

3 August, 2023

Case study cover for AEIS LLC: Failure Analysis of a Boiler due to Thermal Stresses.

Failure Analysis of a Boiler due to Thermal Stresses

An eleven section Boiler was found to be leaking after two years of service. Two out of 11 sections from the failed boiler were submitted for determining the cause of failure. The sections were delivered in pieces to the laboratory for failure analysis….